CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
Time and date: 25.12.2023., from 10 AM to 1.30 PM
Location: TEHPRO, Lole Ribara 120, Belgrade
Construction and demolition waste management represents one of the main problems and challenges in the field of waste management in the Republic of Serbia. According to the data of the Statistical Office of the Republic of Serbia, in 2020, around 729.000 tons of construction and demolition waste was generated in Serbia.
Although legal obligation for waste producers to separately collect generated waste and sort it according to its future treatment already existed, practice has shown that currently in Serbia there is no separate collection of construction and demolition waste, as well as established scheme for recycling of this type of waste.
In order to solve this problem, Serbian Ministry of Environmental Protection introduced in the last version of the Waste Management Law (“Official Gazette of the RS”, Nos 36/09, 88/10, 14/16, 95/18 and 25/23) provision related to construction and demolition waste management, which served as the basis for the adoption of the Regulation on the Manner and Procedure of Construction and Demolition Waste Management (“Official Gazette of the RS”, No 93/2023). This Regulation, that entered into force at the beginning of November, defines manners and procedures for construction and demolition waste management, as well as all activities related to separate collection, separation, transport, storage, preparation for the reuse, recovery and/or disposal of construction waste.
In order to help you get acquainted with all your obligations related to construction and demolition waste management and to implement provisions of this new legislation in your companies, we organize this workshop. TEHPRO experts with years of experience in the field of waste management and environmental protection, will present you the most important segments of this new legislation, related to:
• Preparation of the Construction and Demolition Waste Management Plan and obtaining consent to that Plan from the competent authority,
• Establishing waste management system for hazardous and non-hazardous construction and demolition waste, by applying recommended measures defined in this Regulation,
• Transport, treatment and disposal of construction and demolition waste,
• Management of hazardous construction and demolition waste that contains asbestos, POPs chemicals or mercury.
APPLICATION
Contact: Dragana Rašić
tel: +381 62 8081 483
e-mail: dragana.rasic@tehpro.rs